PROJECTS

Georgia CCPP

georgia
georgia

georgia
georgia

1/4

Gardabani 240 MW Power Plant Nooter Eriksen HRSG;(2 off]

Inlet Duct

Casing

Stack

Ladders Platforms – Stairs

Stair Tower

Pipe Spools

Flash Tank,Blow Off Tank

Osmaniye Kayali CCPP Project

20161013_105846
20161013_105846

20161013_105812
20161013_105812

IMG_5787_edited
IMG_5787_edited

20161013_105846
20161013_105846

1/8

         OSMANIYE  Power Plant Nooter Eriksen HRSG;

(1 off]

Inlet Duct

Casing

Stack

By Pass Stack

Pipe Spools

Flash Tank,Blow Off Tank

Besiktas Vodafone Football Stadium

BESIKTAS VODAFONE ARENA
BESIKTAS VODAFONE ARENA

BESIKTAS VODAFONE ARENA
BESIKTAS VODAFONE ARENA

1/6

Besiktas Vodafone Area roof structural members (2015).

Gama Hamitabad CCPP Project

1/7

As a contractor, site installation of 2 tanks

(3000 m3 raw water tank, ,2500 m3 Demineralised water tank)

in Hamitabad Combined Cycle Power Plant

Hebetec 3   intercontinental Bridge

rd

yavuz sultan selim 3.bridge
yavuz sultan selim 3.bridge

yavuz sultan selim 3.bridge
yavuz sultan selim 3.bridge

yavuz sultan selim 3.bridge
yavuz sultan selim 3.bridge

yavuz sultan selim 3.bridge
yavuz sultan selim 3.bridge

1/5

 

Material which is used for installation of the centre parts of the 3rd intercontinental Bridge             (Istanbul Turkey).

Tupras Refinery HRSG  Kirklareli

1/6

TÜPRAS KIRIKKALE  HRSG  Inlet Duct
(Aalborg Boiler)

1/5

Eren Enerji 230 hrs Coal Bunker